This project was an installation of a new sanitary sewer main. S.E.T., Inc. installed 500 LF of 8” Vitrified Clay Pipe, as well as associated lateral connections and manholes. Additional work items included selective tree removal, maintenance of traffic, erosion control, drive apron repair, trench pavement, and lawn restoration. Portions of the trench excavation exceeded 20’ in depth, requiring significant dewatering and rock excavation.