Existing structure demolition, sludge bed removal, deep foundation excavation, valve vault installation and more.
Read more
Full depth roadway reconstruction of roughly 3,200 LF of Hankins Rd. in Massillon, Ohio.
Project consisted of Storm Sewer / Sanitary Sewer repairs/upgrades at 6 locations throughout the city of Ravenna.
Project consisted of installation of approximately 1,350 lf of 8” Ductile Iron water main and more.
Construction of a new intersection along SR 50.
Project consisted of removal of an existing brick arch culvert and installation of a new 60” HDPE storm sewer.
This project was an installation of a new sanitary sewer main.
Project consisted of the extension of South Water Street and construction of South 26th street.
Installation of water main, fire hydrants, valves, and pavement replacement.
S.E.T., Inc. removed a failed 96” CMP culvert, and replaced it with an 8’ x 7’ precast box culvert.
S.E.T., Inc. acted as a subcontractor on this project to aid in the construction of a new water treatment plant.
This project consisted of removal/replacement of an existing live sanitary sewer.
Improvement of 1.76 miles of SR 309 in Lima, OH.
Transportation infrastructure improvement project.
Downtown streetscape improvement project.